top of page
Search

White Boards I Have Known

M&V is Conceptual

ree

This picture, a random shot on a random day, from the sixth floor of 1400 Smith Street. AKA ENRON Energy Services.


What's going on here? Do you see malfeasance? Engineering? Risk Management?

In the moment, and across time, the team at ENRON looked at the physical world and the energy demanded of its inhabitants as a constantly fluctuating set of probabilities.

ree

Fast forward to CMVP training scribbles from June 2022. It's the same story. Quantifying the absence of energy requires a broad understanding of what is stable, and what is variable. Tools and processes to accomplish settlement must not ignore uncertainty - they should embrace it.


M&V is too important to be left to the engineers? Maybe. Or maybe Measuring and Verifying is perfect for engineers. But MM&V (Measuring, Modeling and Verifying) requires additional cognitive and attitudinal qualities.


What makes someone good at MM&V? That's what we'll investigate on this site in the years ahead.


 
 
 

Recent Posts

See All
Metabolism Modeling

Fully integrated M&V 1) Define “building metabolism” as your model substrate Treat the asset as a network of stocks and flows with conservation constraints. Stocks (s): thermal mass (kWh_th), water

 
 
 
The Changing Vocabulary of "M&V"

I asked ChatGPT "how are observability engineering and digital twins related?" They’re deeply related —almost symbiotic—but operate at...

 
 
 
Counterfactuals through the Decades

Below is a thematic report that traces the evolving importance of counterfactual reasoning—from the early insights of Herbert Simon in...

 
 
 

Comments


Counterfactual Designs ©2024

bottom of page